CSG August Newsletter 2019 (copy 01)

*|MC:SUBJECT|*

WE HAVE MOVED!
We’re excited to share that... WE HAVE MOVED! ?

BIM CAVE (Cave Automatic Virtual Environment)
Bringing to you our very own BIM CAVE in our new office!

A BIM Cave is a projection VR system that creates virtual worlds via 3D projections in a “cave” like environment with users wearing lightweight 3D glasses! In a BIM CAVE, you can visualize designs, have a 3D model walk-through, implement MEP clash coordination, execute constructability review, and more. 

Stay tuned for more updates! 

TOP STORIES & UPDATES
  • Lum Chang will be adopting Novade Safety on their 7 years project - North-South Corridor (Contract N110).
  • Boustead & Obayashi will be using Novade Activity on their new projects. 
  • Mintat Construction will be adopting Novade Platform for their HDB G28B project! 
  • Chye Joo Construction will be using Novade Safety to manage their Sentul Crescent Extension and Bridge Project and Contract CR1087 respectively!
  • Unison Construction will be adopting Novade Safety and Workforce to manage their project - Amber Park.
  • Most popular course of the month - Autodesk Dynamo Training! Lum Chang has registered for two classes for the Dynamo course. Contact us now to find out the available courses!
WORKSHOPS & EVENTS

Digitally Manage Your
On-Site Workforce Workshop

Novade Workforce management is a collaborative system to manage and monitor workforces. The attendees have gained insight into how they can digitize your workforce management such as track hours and attendanceoptimize human resources, automate the data transfer on work hours from site to HQ by using digital timecards.

Streamline Your Design to
Fabrication Process Workshop

Dive deeper into BIM to gain even greater value across the fabrication, manufacturing and assembly workflow. The attendees have gained knowledge on how an integration between your BIM Model and SOLIDWORKS can help them to streamline workflowproduce detailed designs, and use the output from engineer design to fabricate directly.

4D Scheduling & Project Controls
with PowerProject Workshop

How can PowerProject help to fulfill IDD requirements for 4D scheduling & resource planning? The attendees have learned how to create schedule with ease of “Drag and drop”, compare Planned Vs Actual schedule plans via 3D window, display timeline simulations of the construction sequence and more.

Immersive Edu Tech Meetup: 
Let's Build! @ Ngee Ann Polytechnic

We have been invited to Ngee Ann Polytechnic to conduct a workshop regarding the 3D capture and virtual tour creation with Matterport. The students have learned how Matterport 3D camera captures 2D photography and 3D data and automatically stitches them into a complete and immersive 3D model.

UPCOMING WORKSHOPS
Join us for our upcoming workshops to get a better understanding of the available solutions that can assist you to win more tenders and increase productivity on your projects. To register, please contact Victoria at 6588 2378 or drop us an email to marketing@csglobal-group.com.

Performance Base Design with SketchUp & Sefaira Workshop *New*
Learn how you can get an early stage analysis for building performance, join us for the workshop!

Fast & easy to use

  • Draw using SketchUp or Revit
  • Get your first results in minutes
  • Create easy-to-understand graphics

Credible

  • Runs full hourly annual simulations
  • Uses EnergyPlus and Radiance
  • Offers wide range of inputs & controls

Collaborative

  • Work as a team on shared projects
  • Easy to peer review results
  • Online platform crosses firm boundaries
Date: TBC
Time: TBC

Choosing the Right IDD Collaboration Platform Workshop
The Integrated Digital Delivery (IDD) Initiative incorporates Digital Design, Digital Manufacturing & Fabrication, Digital Construction, and Digital Asset Delivery & Management. Come and hear about what are the collaboration platforms available in the market for you to be IDD ready!

Date: 16 August 2019, Friday
Time: 3pm to 5pm

Increase Productivity for PPVC Processes Workshop 
*New*
Prefabricated Prefinished Volumetric Construction (PPVC) is gaining traction and widely deployed on projects around the world. Novade is the platform of choice to monitor pre-fabrication operations. Companies are able to deploy quality controls for each module and get real-time monitoring of all components’ status and location.

Register for the workshop to learn how Novade can boost productivity on pre-fabrication processes!


Date: 21 August 2019, Wednesday
Time: 3pm to 5pm

 
*Free refreshments are provided.
 
TRAINING CENTRE
New Launch Promotion: SketchUp Essentials Training @ 25% OFF!

Learn how SketchUp can make your 3D Projects more polished and presentable! 
5 Advantages of SketchUp:
  • Easy to draw your design
  • Adjust to lifelike drawings
  • Render surfaces in an array of "styles"
  • Easy to integrate with other software
  • SketchUp you can place your model within "Google Earth" - right on the actual site!
Click here to find out more.

Congratulations to Mr. Erro Archie Bacalando (MEP Fundamentals) and Ms. Felicia Chen (Architecture Fundamentals)! They have achieved the TOP results for the class test!

Attend CSG training and let our highly qualified trainers impart their knowledge of the industry to you!

PRODUCT UPDATES
CMiC
The latest version of CMiC Mobile field 2.6.1 for iOS and Windows 10 has been released! Clients can now attach multiple photos at a time, zoom in after linking annotation to document, and utilize search tool by contact or business partner! Click here to find out more.

Novade
The latest version of the Novade iOS app 5.8.35 has been released and is now available on the App Store / iTunes! Novade mobile app UI has been refreshed with new icons with a view to unify the experience across different modules. Additionally, a new web UI feature has been released! Clients are now able to resize columns and sort information by column in the table views. Click here to find out more.
INDUSTRY NEWS
  • Over the last five years, we have witnessed the widespread application of digital technology across the construction industry. With it, contractors and clients have enjoyed considerable benefits, ranging from increased productivity to the attraction of bright young talent to the sector. Incorporating these types of technology is saving between 10-30% of time that would otherwise have been spent accessing or creating traditional “paperwork”. - PBC Today , BIM News, 08 July 2019
     
  • Technology is playing an increasingly important role in the shift to offsite construction. Robotics and other automation technologies are enhancing and speeding up the manufacturing process, making it more like automotive production. Many modular players utilize virtual and augmented reality programs, which create digital models that allow customers to visualize and tailor designs before they are built. Technology also is helping facilitate digitally-enabled, "just-in-time" delivery to the jobsite. - Construction Dive, 03 July 2019
     
  • Shifting construction away from traditional sites and into factories could dramatically change the way we build. Modular construction offers the industry an opportunity to make a step change: shifting many aspects of building activity away from traditional construction sites and into factories with off-site, manufacturing-style production. Modular (or prefabricated) construction is not a new concept, but technological improvements, economic demands, and changing mind-sets mean it is attracting an unprecedented wave of interest and investment. If it takes hold, it could give the industry a huge productivity boost, help solve housing crises in many markets, and significantly reshape the way we build today. - McKinsey, June 2019
Copyright © 2019 CS Global Group Pte Ltd, All rights reserved.

Jesslyn Tan
Marketing Executive


CS GLOBAL GROUP PTE LTD

60 Ubi Crescent #01-01 Ubi Techpark Singapore 408569
Tel: 6588 2378 | Email: marketing@csglobal-group.com
www.csglobal-group.com

Want to change how you receive these emails?
You can update your preferences or unsubscribe from this list.






This email was sent to *|EMAIL|*
why did I get this?    unsubscribe from this list    update subscription preferences
*|LIST:ADDRESSLINE|*